Keep the insulation mechanisms separate

Clearance is a path through air; creepage follows an insulating surface; solid insulation is through the material. Different conditions govern each. Contamination, altitude, humidity, field concentration and coatings can affect the completed assembly.

Do not multiply a catalog value into a rating

A kV/mm test value has a stated specimen, method and duration. Multiplying it by thickness is not a qualified working-voltage calculation. Determine the required insulation system and tests using the applicable product requirements and qualified engineering review.

Review copper edges and interfaces

Copper-to-edge spacing, etched profiles, braze regions, vias and encapsulation interfaces influence local electric fields. Partial discharge and surface contamination can matter even when a simple withstand test passes. Include actual package materials and operating conditions in validation.

Engineering example

A substrate that passes a short dielectric withstand test may still require additional partial-discharge and environmental assessment for its intended service. The two tests answer different questions.

Before you release the design

  • Define working voltage, transients and insulation function.
  • Use the applicable product standard and test conditions.
  • Evaluate the assembled geometry and interfaces.

Sources and further technical reading

Manufacturer references support the material and process context. Worked examples and checklists are engineering guidance; they are not test results or supplier guarantees.

  1. Rogers curamik ceramic substrates — technical data sheet
  2. Kyocera — ceramic packaging materials